What needs to be known?
The equipment list, drawings, manuals and initial settings should be located in the same file. Recording invisible installation routes will be beneficial in future work.
Check when making decisions
- Get the installation drawing
- Record serial numbers
- Store testing and training records
First decision: use and space
Prioritize swimming, rest, and hospitality before drawing. Instead of dedicating the entire garden to the pool, consider the collaboration of circulation, service, shower and seating areas. Access to the technical volume and the route through which the equipment will be transported should also be visible on the site plan.
Compare offers within the same scope
It becomes easier to compare options when excavation, structure, insulation, coating, mechanical installation, electrical, environmental works and commissioning are defined as separate items. See in writing which items the size or material change affects. Application schedule; site access is considered along with drying times and supply.